Skip to main content

Migration

This section guides you through migrating NethVoice from NethServer 7 to NethServer 8, ensuring a smooth transition with minimal downtime.

Overview

The migration process involves three main phases:

  1. Prerequisites - Verify system requirements, network connectivity, and prepare your data
  2. Start Migration - Install migration tools, connect systems, and transfer data
  3. Post-Migration - Verify functionality, finalize configuration, and optimize performance

Each phase includes detailed steps, troubleshooting guides, and verification checklists to ensure a successful transition.

info

This migration typically takes 2-4 hours depending on your system size and data volume. Plan your migration during a maintenance window to minimize user impact.

NethVoice 8.0